Telecom Tower Construction
01.​
Site Survey and Acquisition
-
Identifying and securing suitable locations for tower installation.
-
ï‚· Site feasibility survey
02.​
Tower Design and Engineering
Structural planning based on site conditions and load requirements.
-
ï‚· Structural analysis
-
ï‚· Tower type selection (monopole, guyed, lattice)
-
ï‚· Design approval from authorities
03.​
Civil Works
-
Groundwork and foundation preparation.
-
ï‚· Excavation and foundation laying
-
ï‚· Construction of equipment shelters
-
ï‚· Fencing and compound wall building
04.​
Tower Erection
Physical raising and installation of the tower.
-
ï‚· Assembling tower components
-
ï‚· Mounting antennas and dishes
-
ï‚· Safety and stability checks
05.​
Electrical and Power Setup
Ensuring power availability and backup systems.
-
ï‚· Electrical wiring and connections
-
ï‚· Installation of DG (diesel generator) sets and solar panels
-
ï‚· Battery bank setup and grounding
06.​
Telecom Equipment Installation
Setting up telecom gear on the tower and at the base station.
-
ï‚· BTS (Base Transceiver Station) installation
-
ï‚· Antenna alignment and feeder cable laying
-
ï‚· Microwave equipment installation
07.​
Testing and Commissioning
Final checks before operational handover.
-
ï‚· Signal strength and quality testing
-
ï‚· Drive tests
-
ï‚· Integration with telecom network
08.​
Operation & Maintenance (O&M)
Ongoing support after installation.
-
ï‚· Routine tower inspection
-
ï‚· Power system maintenance
-
ï‚· Emergency repair services